GAO was asked to assess the extent to which NNSA and the Department of Defense (DOD) have effectively managed the refurbishment of two other weapons – the B61 bomb and the W76 warhead. This report summarizes the findings of GAO’s classified report.
http://www.gao.gov/new.items/d09385.pdf